Material Section:
Trade Name: Sikadur 22 Lo-Mod
- Product Info
- Attachments
- Recommendations
| Manufacturer: Sika Corp. | ||||||
| Recommended Uses-Primary: Waterproofing Membranes and Materials | ||||||
| This information is filed by David Quarles on Oct 10, 2007 | ||||||
| Contact Information: | ||||||
| KYTC - Materials | ||||||
| 1227 Wilkinson Blvd | ||||||
| Frankfort, KY 40601 | ||||||
| Phone: 502-564-3160 | ||||||
| Email: David.Quarles@ky.gov | ||||||
Select the attachment you wish to open and double click on it. If a window appears asking DO YOU WANT TO SAVE THIS FILE? that means you must save the file to your hard drive and then open it from your hard drive. We apologize for the inconvenience. |
| This product has been reviewed by Division of Materials, Kentucky Transportation Cabinet. As date of Mar 09, 2009, its status is phase VI. Please see bottom table for detail information about phase. | ||||||
| Notes: | ||||||
| Meets current specifications. 3/04 | ||||||
Recommendations and Comments |
||||||
Division |
Reviewer |
Recommendation |
Comment |
Response |
Date |
|
|---|---|---|---|---|---|---|
| KYTC - Materials | David Quarles | N/A | I contacted company to update their info on 4/23/009. DQ | Apr 23, 2009 | ||
| NEW PRODUCTS COMMITTEE EXPLANATION OF PHASES STATE HIGHWAY ENGINEER'S MANUAL CHAPTER 49-19.0500 |
|||
| Phase I | Product has been submitted and is pending initial review by the chairman of the committee. | ||
| Phase II | The product is under preliminary review by appropriate sections(s)/Division(s) and awaiting recommendations(s) to the chair from the appropriate section(s)/division(s). Minimal study of available literature is necessary at this stage. | ||
| Phase III | Product is under detailed laboratory and/or literature review by the New Product Review Committee. | ||
| Phase IV | Product has been approved for experimental use by the New Product Review Committee. The product may be used on a limited basis; however, change orders must be submitted and approved prior to use of the product. The product will be monitored for performance for two years, but the performance period may be changed depending on the type of product and susceptibility to weathering. If the product performs poorly and poses a safety risk, the product may be removed before scheduled replacement. | ||
| Phase V | The product has been approved for use by the New Products Review Committee. The contractor must have the product approved by the KYTC and the Federal Highway Administration (if applicable) prior to use of the product on a project. Standard Specifications or Special Notes are being developed for this type of material/product. | ||
| a. b. c. |
|||
| Phase VI | Current specifications exist for this type of product. It may be requested that the manufacturer submit samples, NTPEP test data, and/or provide requested information to have the product approved and placed on the List of Approved Materials (if applicable). | ||
| Phase VII | Product has been sent the New Product Review Committee for final approval consideration. | ||
| Phase VIII | Not a product to be evaluated by the New Products Review Committee. | ||
| a. b. c. d. |
|||
| Phase IX | Specifications exist for product however, there is no List of Approved Materials for this type of product at this time. Product may be used provided it meets the required specifcation or special condition(s) listed. | ||
| Phase X | Product has been approved and specifications or special note exists. | ||
| Phase XI | Product is approved for use however there is no specification or special note. Product must have KYTC approval before use. | ||
| Phase XII | Reserved | ||
| Phase XIII | Product not approved for use in Kentucky highway or bridge construction. | ||
| a. b. c. d. e. f. g. h. |
|||
| Phase XIV | Reserved | ||
| Phase XV | Reserved | ||