Product Detail Information

Material Section: Chemical
Trade Name: PCBM-T12

  • Product Info
  • Attachments
  • Recommendations
 
This product is Not Patented
 
Manufacturer: Pexco, Davidson Traffic Control Products
Address: 3110 70th Ave E
          Tacoma ,  WA   98424
 
Background description of company and its products: 
  Filtrona Extrusion, maker of Davidson Traffic Control Products, has long been recognized as an innovative manufacturer of traffic parts.
Recommended Uses-Primary:  Traffic Marking Materials
Recommended Uses-Alternate: 
Outstanding Features or Advantages Claimed:
  Product is made of high-impact weatherable thermoplastic with a built in urethane hinge, providing flexibility and impact resistant.
General Composition of Material:
  Attached
Date introduced on Market: 0000-00-00
Alternate for Following Existing Product: PCBM-12, Flex 2020
Cost Per Unit Material (F.O.B.): $3.00
Royalty Cost: $0.00
Cost Per Unit in Place: $3.00
 
Material Specifications Furnished by Manufacturer?  To Be Mailed
Product Availability:  Non-Seasonal , Delivery at Site Within 21  Days after Receipt of Order
Can Samples Be Provided?  Yes. Samples can be provided
At Cost $0.00 for Laboratory Testing
Free for Field Testing
 
This product meets requirements of following specifications:
    Others: Mutcd, 2003, section
This product has/is being evaluated by following Highway authorities or agencies:
  N/A
This product is approved for use by other highway authorities or other agencies?
  Arizona, California, Kansas (all routine)
Another office of the Kentucky Department of Highways has been contacted.
  Contact Date: Nov 30, -001
 
Product Web Page:  http://www.pexco.com/pages/TrafficBarrier.aspx
 
This information is filed by  Erika Whitney on  Sep 01, 2009
Contact Information:
  Pexco LLC
  3110 70th Ave E
  Tacoma,   WA  98424
  Phone: 253-284-8000
  Email: tracy.hoffner@pexco.com
 
 
Select the attachment you wish to open and double click on it. If a window appears asking DO YOU WANT TO SAVE THIS FILE? that means you must save the file to your hard drive and then open it from your hard drive. We apologize for the inconvenience.
 
Attached Files for This Product
 
File Name
Type
Size
Uploaded By
Organization
Date
CA PCBM-T12 6-28-2002.pdf
application/pdf57618Tracy HoffnerPexco LLC
Sep 01, 2009
KS PCBM-T12 Approval 05-02.pdf
application/pdf245616Tracy HoffnerPexco LLC
Sep 01, 2009
 
This product has been reviewed by Division of Materials, Kentucky Transportation Cabinet.  As date of  Sep 21, 2009, its status is  phase  II.   Please see bottom table for detail information about phase.
Notes:
  Under preliminary review.
 
 
NEW PRODUCTS COMMITTEE
EXPLANATION OF PHASES
STATE HIGHWAY ENGINEER'S MANUAL
CHAPTER 49-19.0500
Phase I   Product has been submitted and is pending initial review by the chairman of the committee.
Phase II   The product is under preliminary review by appropriate sections(s)/Division(s) and awaiting recommendations(s) to the chair from the appropriate section(s)/division(s). Minimal study of available literature is necessary at this stage.
Phase III   Product is under detailed laboratory and/or literature review by the New Product Review Committee.
Phase IV   Product has been approved for experimental use by the New Product Review Committee. The product may be used on a limited basis; however, change orders must be submitted and approved prior to use of the product. The product will be monitored for performance for two years, but the performance period may be changed depending on the type of product and susceptibility to weathering. If the product performs poorly and poses a safety risk, the product may be removed before scheduled replacement.
Phase V   The product has been approved for use by the New Products Review Committee. The contractor must have the product approved by the KYTC and the Federal Highway Administration (if applicable) prior to use of the product on a project. Standard Specifications or Special Notes are being developed for this type of material/product.
      a.
b.
c.
Phase VI   Current specifications exist for this type of product. It may be requested that the manufacturer submit samples, NTPEP test data, and/or provide requested information to have the product approved and placed on the List of Approved Materials (if applicable).
Phase VII   Product has been sent the New Product Review Committee for final approval consideration.
Phase VIII   Not a product to be evaluated by the New Products Review Committee.
      a.
b.
c.
d.
Phase IX   Specifications exist for product however, there is no List of Approved Materials for this type of product at this time. Product may be used provided it meets the required specifcation or special condition(s) listed.
Phase X   Product has been approved and specifications or special note exists.
Phase XI   Product is approved for use however there is no specification or special note. Product must have KYTC approval before use.
Phase XII   Reserved
Phase XIII   Product not approved for use in Kentucky highway or bridge construction.
      a.
b.
c.
d.
e.
f.
g.
h.
Phase XIV   Reserved
Phase XV   Reserved