| Generic Name: Shotcrete MS | ||||||
| This product is Not Patented | ||||||
| Manufacturer: The Quikrete Companies | ||||||
| Address: 6225 Huntley Rd | ||||||
| Columbus , Oh 43229 | ||||||
| Background description of company and its products: | ||||||
| Manufacturer of Cement & Concrete Products throughout the United States, Canada and S America | ||||||
| Recommended Uses-Primary: Patching Materials | ||||||
| Recommended Uses-Alternate: Miscellaneous | ||||||
| Outstanding Features or Advantages Claimed: | ||||||
| *can be used for horizontal, verical and overhead applications *has a very low water cement ratio *material achieves very high strengths *improved sulphate resistance *high adhesion & low sag *low permeability *protects steel reinforcing, carbon steel, galvanized steel and other metals embedded in concrete from corrosion induced by carbonation,chlorides and atmospheric attack | ||||||
| General Composition of Material: | ||||||
| C-33 sand, portland cement, micro-silica, fiber,corrosion inhibitor | ||||||
| Date introduced on Market: 0000-00-00 | ||||||
| Alternate for Following Existing Product: Shotcrete MS | ||||||
| Cost Per Unit Material (F.O.B.): $0.00 | ||||||
| Royalty Cost: $0.00 | ||||||
| Cost Per Unit in Place: $0.00 | ||||||
| Material Specifications Furnished by Manufacturer? To Be Mailed | ||||||
| Product Availability: Non-Seasonal , Delivery at Site Within 10 Days after Receipt of Order | ||||||
| At Cost $0.00 for Laboratory Testing | ||||||
| Free for Field Testing | ||||||
| This product meets requirements of following specifications: | ||||||
| ASTM: C-1480 | ||||||
| This product has/is being evaluated by following Highway authorities or agencies: | ||||||
| Pennsylvania | ||||||
| This product is approved for use by other highway authorities or other agencies? | ||||||
| Pennsylvania - Bulletin 15 | ||||||
| Another office of the Kentucky Department of Highways has been contacted. | ||||||
| Contact Date: Nov 30, -001 | ||||||
| Product Web Page: quikrete.com | ||||||
| This information is filed by jason pinney on Jul 05, 2011 | ||||||
| Contact Information: | ||||||
| The Quikrete Companies | ||||||
| 6225 Huntley Rd | ||||||
| Columbus, Oh 43229 | ||||||
| Phone: 800-776-6034 | ||||||
| Email: jpinney@quikrete.com | ||||||
Select the attachment you wish to open and double click on it. If a window appears asking DO YOU WANT TO SAVE THIS FILE? that means you must save the file to your hard drive and then open it from your hard drive. We apologize for the inconvenience. |
| This product has been reviewed by Division of Materials, Kentucky Transportation Cabinet. As date of Jul 07, 2011, its status is phase IV. Please see bottom table for detail information about phase. | ||||||
| Notes: | ||||||
| Approved for experimental use through fast track request. | ||||||
Recommendations and Comments |
||||||
Division |
Reviewer |
Recommendation |
Comment |
Response |
Date |
|
|---|---|---|---|---|---|---|
| Ky Transportation Cabinet | Allen Myers | Approve | Jul 07, 2011 | |||
| Ky Transportation Cabinet | Allen Myers | Approve | Jul 07, 2011 | |||
| KYTC/Maintenance | Nancy Albright | Approve | experimentally | Jul 07, 2011 | ||
| Traffic Operations | Jeff Wolfe | Undecided | This product does not appear to have applications related to Traffic Operations. We would defer to subject matter experts within the Cabinet. | Jul 06, 2011 | ||
| Ky Assoc. of Hwy Contractors | Michael LaRue | Undecided | Jul 06, 2011 | |||
| KYTC/Construction | Steve Criswell | Approve | Based on the attached information I would recommend this as a experimental product. | Jul 06, 2011 | ||
| NEW PRODUCTS COMMITTEE EXPLANATION OF PHASES STATE HIGHWAY ENGINEER'S MANUAL CHAPTER 49-19.0500 |
|||
| Phase I | Product has been submitted and is pending initial review by the chairman of the committee. | ||
| Phase II | The product is under preliminary review by appropriate sections(s)/Division(s) and awaiting recommendations(s) to the chair from the appropriate section(s)/division(s). Minimal study of available literature is necessary at this stage. | ||
| Phase III | Product is under detailed laboratory and/or literature review by the New Product Review Committee. | ||
| Phase IV | Product has been approved for experimental use by the New Product Review Committee. The product may be used on a limited basis; however, change orders must be submitted and approved prior to use of the product. The product will be monitored for performance for two years, but the performance period may be changed depending on the type of product and susceptibility to weathering. If the product performs poorly and poses a safety risk, the product may be removed before scheduled replacement. | ||
| Phase V | The product has been approved for use by the New Products Review Committee. The contractor must have the product approved by the KYTC and the Federal Highway Administration (if applicable) prior to use of the product on a project. Standard Specifications or Special Notes are being developed for this type of material/product. | ||
| a. b. c. |
|||
| Phase VI | Current specifications exist for this type of product. It may be requested that the manufacturer submit samples, NTPEP test data, and/or provide requested information to have the product approved and placed on the List of Approved Materials (if applicable). | ||
| Phase VII | Product has been sent the New Product Review Committee for final approval consideration. | ||
| Phase VIII | Not a product to be evaluated by the New Products Review Committee. | ||
| a. b. c. d. |
|||
| Phase IX | Specifications exist for product however, there is no List of Approved Materials for this type of product at this time. Product may be used provided it meets the required specifcation or special condition(s) listed. | ||
| Phase X | Product has been approved and specifications or special note exists. | ||
| Phase XI | Product is approved for use however there is no specification or special note. Product must have KYTC approval before use. | ||
| Phase XII | Reserved | ||
| Phase XIII | Product not approved for use in Kentucky highway or bridge construction. | ||