| Product Detail Information |
Material Section: Concrete
Trade Name: NitroCast NC
- Product Info
- Attachments
- Recommendations
| Generic Name: Type C Admixture | ||||||
| This product is Not Patented | ||||||
| Manufacturer: Premiere Concrete Admixtures | ||||||
| Address: 508 Cedar St | ||||||
| Pioneer , OHIO 43554 | ||||||
| Background description of company and its products: | ||||||
| Premiere Concrete Admixtures offers one of the concrete industries largest and most complete lines of chemical admixtures. We are based out of Pioneer Ohio and we are an American owned Company helping to service and enhance the Concrete Industry. | ||||||
| Recommended Uses-Primary: Portland Cement Concrete Admixtures | ||||||
| Recommended Uses-Alternate: | ||||||
| Outstanding Features or Advantages Claimed: | ||||||
| Dramatically increases early compressive and flexural strengths without detriment to ultimate strengths Reduces set time, curing time and costs Improves the quality of concrete by decreasing water cement ratio Improves mix cohesiveness Improves cement hydration and maximizes cement performance Improves finishability Enhances concrete pumping | ||||||
| General Composition of Material: | ||||||
| Chemical Admixture | ||||||
| Date introduced on Market: 2007-01-15 | ||||||
| Alternate for Following Existing Product: N/A | ||||||
| Cost Per Unit Material (F.O.B.): $6.00 | ||||||
| Royalty Cost: $0.00 | ||||||
| Cost Per Unit in Place: $5.62 | ||||||
| Material Specifications Furnished by Manufacturer? To Be Mailed | ||||||
| Product Availability: Non-Seasonal | ||||||
| Can Samples Be Provided? Yes. Samples can be provided | ||||||
| At Cost $0.00 for Laboratory Testing | ||||||
| Free for Field Testing | ||||||
| This product meets requirements of following specifications: | ||||||
| AASHTO: M 194 ASTM: C 494 | ||||||
| This product has/is being evaluated by following Highway authorities or agencies: | ||||||
| Ohio Department of Transportation, Amir Tehrani | ||||||
| This product is approved for use by other highway authorities or other agencies? | ||||||
| Ohio Department of Transportation, Amir Tehrani It is in routine use in this State. | ||||||
| Another office of the Kentucky Department of Highways has been contacted. | ||||||
| Contacted Office: N/A Contact Date: Nov 30, -001 | ||||||
| Product Web Page: Premiereadmix.com | ||||||
| This information is filed by James Sobek on Feb 09, 2012 | ||||||
| Contact Information: | ||||||
| Premiere Concrete Admixtures | ||||||
| 508 Cedar St | ||||||
| Pioneer, OHIO 43554 | ||||||
| Phone: 989-255-6807 | ||||||
| Email: james.sobek@premiereadmix.com | ||||||
There is not any attachment for this product screened by administrator, now.
| This product has been reviewed by Division of Materials, Kentucky Transportation Cabinet. As date of Apr 19, 2012, its status is phase VI. Please see bottom table for detail information about phase. | ||||||
| Notes: | ||||||
| Product is a type E admixture and falls under Section 802.01.04 of the 2008 Standard Specifications. | ||||||
| NEW PRODUCTS COMMITTEE EXPLANATION OF PHASES STATE HIGHWAY ENGINEER'S MANUAL CHAPTER 49-19.0500 |
|||
| Phase I | Product has been submitted and is pending initial review by the chairman of the committee. | ||
| Phase II | The product is under preliminary review by appropriate sections(s)/Division(s) and awaiting recommendations(s) to the chair from the appropriate section(s)/division(s). Minimal study of available literature is necessary at this stage. | ||
| Phase III | Product is under detailed laboratory and/or literature review by the New Product Review Committee. | ||
| Phase IV | Product has been approved for experimental use by the New Product Review Committee. The product may be used on a limited basis; however, change orders must be submitted and approved prior to use of the product. The product will be monitored for performance for two years, but the performance period may be changed depending on the type of product and susceptibility to weathering. If the product performs poorly and poses a safety risk, the product may be removed before scheduled replacement. | ||
| Phase V | The product has been approved for use by the New Products Review Committee. The contractor must have the product approved by the KYTC and the Federal Highway Administration (if applicable) prior to use of the product on a project. Standard Specifications or Special Notes are being developed for this type of material/product. | ||
| a. b. c. |
|||
| Phase VI | Current specifications exist for this type of product. It may be requested that the manufacturer submit samples, NTPEP test data, and/or provide requested information to have the product approved and placed on the List of Approved Materials (if applicable). | ||
| Phase VII | Product has been sent the New Product Review Committee for final approval consideration. | ||
| Phase VIII | Not a product to be evaluated by the New Products Review Committee. | ||
| a. b. c. d. |
|||
| Phase IX | Specifications exist for product however, there is no List of Approved Materials for this type of product at this time. Product may be used provided it meets the required specifcation or special condition(s) listed. | ||
| Phase X | Product has been approved and specifications or special note exists. | ||
| Phase XI | Product is approved for use however there is no specification or special note. Product must have KYTC approval before use. | ||
| Phase XII | Reserved | ||
| Phase XIII | Product not approved for use in Kentucky highway or bridge construction. | ||
| a. b. c. d. e. f. g. h. |
|||
| Phase XIV | Reserved | ||
| Phase XV | Reserved | ||
